The Washington State Department of Transportation utilized cutting-edge technology to manage the impact of a construction project aimed at rehabilitating the concrete decks of multiple bridges through robust deck patching and related repairs. Located in Southwest Washington, this $3.9 million project has already made a significant impact in the region. The intention is to remove all non-cementitious patches and replace them with new cementitious material, extending the life of the bridge structures until future deck rehabilitation projects can better address each bridge’s individual needs.
