UT: Use of Innovative Technologies on 4500 South Bridge Replacement

Award Winner: Small Project – Innovative Management
Use of Innovative Technologies on 4500 South Bridge Replacement
Salt Lake City, UT

“I was able to witness the destruction of the old bridge and the installation of the new bridge and was amazed at the precision and short time frame in which this was completed.”

Use of Innovative Technologes on 4500 South Bridge Replacement Project

Utah DOT’s use of innovative construction and bidding methods, especially for bridges was exemplified during the 4500 South Bridge replacement in 2007. The project, which replaced a 3.5 million pound, 172 foot long single-span structure bridge in 53 hours, was witnessed by more than 60 department of transportation executives from around the country, thousands of spectators and the news media – with more than 100 local stories and coverage nationally on CNN and ABC News.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s